Honshu-Shikoku Bridge

Honshu-Shikoku Bridge
Of the 17 long-span bridges spanning straits between the islands of Honshu and Shikoku (not including the Bannosu Viaduct, a long-span truss bridge, as it is an overland bridge), MIYAJI ENGINEERING GROUP has been involved in the construction of 10 (or 11, if the Bannosu Viaduct is included). Of these, we played an important role as the joint venture’s representative company in 9 of the bridges (or 10, if the Bannosu Viaduct is included).
We also played a central role in the construction of the Akashi-Kaikyo Bridge, Japan’s largest suspension bridge, and Tatara Bridge, Japan’s largest cable-stayed bridge.







Minami Bisan-Seto Bridge




Ohnaruto Bridge
Total length: 1,629 m, main span: 879.3 m, steel weight: 54,163 t; three-span continuous suspension bridge with a stiffening girder truss structure (completed in 1984)

Akashi-Kaikyo Bridge
Total length: 3,911.1 m, main span: 1,990.8 m, steel weight: 178,138 t; three-span continuous suspension bridge with a stiffening girder truss structure (completed in 1997)

Shimotsui-Seto Bridge
Total length: 1,200 m, main span: 940 m, steel weight: 59,714 t; single-span suspension road-rail bridge with a stiffening girder truss structure (completed in 1986)

Hitsuishijima Bridge
Total length: 840 m, main span: 420 m, steel weight: 33,796 t; three-span continuous cable-stayed, road-rail bridge with a stiffening girder truss structure (completed in 1986)

Yoshima Bridge
Total length: 588 m, main span: 245 m, steel weight: 22,136 t; three-span continuous upper-deck truss, road-rail bridge (completed in 1986)

Kita Bisan-Seto Bridge, Minami Bisan-Seto Bridge
Kita Bisan-Seto Bridge/Total length: 1,518 m, main span: 990 m, steel weight: 67,297 t
Minami Bisan-Seto Bridge/Total length: 1,628 m, main span: 1,100 m, steel weight: 79,952 t
Both of the bridges are three-span continuous suspension road-rail bridges with a stiffening girder truss structure (completed in 1986)

Minami Bisan-Seto Bridge/Total length: 1,628 m, main span: 1,100 m, steel weight: 79,952 t
Both of the bridges are three-span continuous suspension road-rail bridges with a stiffening girder truss structure (completed in 1986)
Tatara Bridge
Total length: 1,480 m, main span: 890 m, steel weight: 31,888 t; three-span continuous cable-stayed bridge with box girder cross-section stiffening girders (completed in 1998)

Hakata-Ohshima Bridge
Hakata Bridge/Total length: 327 m, main span: 145 m, steel weight: 2,992 t; three-span continuous steel deck box girder bridge (completed in 1986)
Ohshima Bridge/Total length: 840 m, main span: 556.2 m, steel weight: 9,386 t; single-span suspension bridge with box girder cross-section stiffening girders (completed in 1986)
* The Hakata and Ohshima Bridges are counted as one strait-spanning bridge (the Hakata-Ohshima Bridge).

Ohshima Bridge/Total length: 840 m, main span: 556.2 m, steel weight: 9,386 t; single-span suspension bridge with box girder cross-section stiffening girders (completed in 1986)
* The Hakata and Ohshima Bridges are counted as one strait-spanning bridge (the Hakata-Ohshima Bridge).
Second Kurushima-Kaikyo Bridge
Total length: 1,515 m, main span: 1,020 m, steel weight: 30,124 t; two-span suspension bridge with box girder cross-section stiffening girders (completed in 1998)

Bannosu Viaduct
Total length: 483 m, main span: 180 m, steel weight: 14,647 t; three-span continuous upper-deck truss, road-rail bridge (completed in 1986)